Integrated Approach
West Middlesex Hospital
Bouygues UK and its sister company Ecovert FM cover the entire project delivery cycle from design and build through to operation and maintenance. Because Ecovert FM is involved during the design development process, we can ensure:
An optimised "whole life" cost
A sustainable and innovative design
Joint procurement and quality control during construction and
Single point responsibility from design and construction through to operation
At Design Stage
Bouygues UK and Ecovert FM have integrated design management teams, which:
ensure the joint review of the project design
ensure maintainability of the facility
optimise the life cycle cost
ensure design resilience
ensure safe and efficient FM operations
At Construction Stage
Bouygues UK and Ecovert FM have integrated construction teams on site. Working side by side, Ecovert FM:
agrees the technical specifications of products and equipment
inputs to the project throughout the construction process
The joint commissioning of the project streamlines the transfer and accelerates the training of the Ecovert FM staff.
At Operational Stage
full ownership of the facility by the Ecovert FM staff
excellent services from day one
operational feed-back used to enhance existing and future schemes
Spirit of Innovation
Innovation is at the very heart of the success of our projects
More
Award Winners
Awards have enhanced the industry recognition of Bouygues UK's approach to PFI projects